Authored NZ slab prototype. Draft outputs are not for construction or fabrication. This is not native RebarGeniX footage or a completed NZ code verification.
English narration by Leanne · Every video under five minutes · Captions and transcripts included.
Checking your saved progress…
Join free to save completion, or sign in.
Start with the outputs; trace them to analysis
NZ slab teaching prototype · draft outputs
English narration transcript
Imagine revising a slab reinforcement drawing, then finding that its bar schedule still shows the earlier bars. Someone has to find the difference, update the quantities and check the package again. RebarGeniX addresses this repeated detailing work by connecting reinforcement records with drawing and schedule production.
We will follow one slab through that workflow. RebarGeniX is a product by Chris Vorster. The screens here are the existing A X K workflow prototype, using an authored New Zealand teaching example. They are not a recording of the native product or an actual project analysis.
Start with the top reinforcement plan. Find bar mark B zero three, and then find the same mark in the schedule. Both outputs come from one defined bar set. That shared record is what keeps the drawing and quantities connected.
Trace the mark back another step. B zero three links to group G three: top reinforcement in the X direction. The mapped moment is forty-one kilonewton metres per metre, with its source strip and load combination retained.
Before using a real export, an engineer must establish the units, directions, tension faces and governing actions. Importing a table does not resolve those decisions automatically. It also does not supply the geometry and detailing information needed to draw the bars.
The mapped results file carries the actions. Our complete teaching work file carries additional inputs, including the geometry and entered bar extents. Keep those files distinct, and preserve the original source.
An AI assistant could help prepare an input register and flag missing information for an engineer to check. The checklist shown here is a prepared teaching overlay. This prototype does not call an AI service or run analysis software.
For your task, follow B zero three back to its group and source. Record its face, direction and action units. Then identify two pieces of information that the results table cannot establish. Save your work file before leaving the prototype.
Check the basis behind the drawings
NZ slab teaching prototype · draft outputs
English narration transcript
A drawing can look coordinated before the engineering behind it has been checked. To understand what our generated reinforcement means, we need to inspect the basis that connects the imported actions to the bar arrangement.
Our teaching slab is two hundred millimetres thick. The entered cover is thirty millimetres, with concrete strength of thirty megapascals and reinforcement yield strength of five hundred megapascals. These are example inputs. They are not recommendations for another project.
The responsible engineer confirms the applicable New Zealand design documents, governing editions, modifications and project requirements. A prefilled confirmation in a teaching file is not evidence that a real project basis has been reviewed.
Open the calculation register and follow group G three. Its mapped action leads to a calculated reinforcement requirement within the prototype’s supported scope. The selected bar diameter and spacing then establish the provided reinforcement for comparison.
This connection makes a useful review trail. Another engineer can examine the action, the assumptions, the calculated requirement and the arrangement that appears in the drawing. If the source or assumptions change, that trail needs to be checked again.
Now look at the wider verification record. In the baseline example, the supported calculated checks show no failures, while six wider verification categories remain open. Those statements describe different parts of the evidence.
A calculation result does not settle every detailing, durability or project requirement. Column punching is not assessed in this teaching example, and the restricted serviceability checks do not amount to a complete project deflection assessment.
AI could help organise this record into checked items, unresolved questions and missing evidence. The engineer still decides whether the evidence is applicable and sufficient.
For your task, identify one supported calculated check, one open verification item and one item not assessed. Explain why a package with no calculated failures can still need substantial engineering review. Keep those open matters visible beside the drawings.
Connect reinforcement groups to the layout
NZ slab teaching prototype · draft outputs
English narration transcript
The analysis table contains actions. The drawing needs actual bar locations. How do we connect the two without losing the engineering decisions between them?
In our teaching slab, four reinforcement groups connect to four bar marks. B zero one represents bottom reinforcement in X. B zero two represents bottom reinforcement in Y. B zero three represents top reinforcement in X, and B zero four represents top reinforcement in Y.
The group carries the source action and selected arrangement. The linked bar set supplies the information needed to place and count the bars. The resulting mark appears in both the plan and the schedule.
Switch between the top and bottom plans. Check the face and direction before comparing rows. Similar-looking reinforcement can represent a different part of the slab, so the labels matter.
Our slab measures six thousand by four thousand five hundred millimetres in plan. The distribution rectangles and bar ends have been entered explicitly. The prototype uses those extents to generate the straight-bar geometry.
That distinction matters near a support. A support-zone action does not, by itself, determine how far a bar should extend or how it develops its force. Anchorage, laps and other detailing decisions need the appropriate engineering assessment. This prototype does not generate those details from the moment values.
The section schematic helps explain the position of the reinforcement layers and the depth used in the section calculation. It remains a schematic, rather than a complete construction section.
Follow B zero three on the plan and in the schedule. Its diameter, spacing and entered extents come from linked records, so the two outputs can stay coordinated when an arrangement changes.
An AI assistant could help prepare a list of missing extent references or inconsistent labels. The current bar generation is performed by the prototype’s programmed tools.
For your task, identify the source group, face, direction and extent reference behind B zero three. Name one additional detailing decision that must be resolved before the arrangement could become part of construction information.
Generate and inspect the drawing sheets
NZ slab teaching prototype · draft outputs
English narration transcript
A useful reinforcement drawing lets the next person understand what is intended and which revision they are looking at. Automation should help produce that information consistently, while leaving the engineer able to inspect it.
Open the generated top and bottom plans. Each plan shows the slab outline, dimensions, reinforcement directions and bar marks derived from the entered bar sets. Start by locating B zero three on the top face.
Check the mark against the arrangement we selected. Then look at the opposite face. A package needs consistent information across its views, even when a change affects only one group.
Choose Download drawing sheets. The prototype produces a printable HTML document containing the bottom plan, top plan and matching straight-bar schedule. The browser provides the print or save-as-PDF option. These are distinct steps, so inspect the resulting document after exporting it.
The prototype also provides a DXF export. That gives us another format for exchanging the generated geometry. A successful download does not establish that a CAD reviewer has opened, checked or accepted the file.
Look at the drawing as its recipient would. Are the dimensions readable? Do the marks match the schedule? Are the face, direction, reinforcement grade and revision clear? Is the draft status visible?
Keep the limits in view as well. These plans show straight bars within entered extents. They do not automatically add support details, opening details, hooks, bends or lap arrangements. The section schematics shown elsewhere in the workspace do not fill those gaps.
AI could assist with a consistency checklist or a draft set of review comments. The evidence still comes from inspecting the actual exported sheets and their underlying records.
For your task, export the drawing sheets and locate B zero three in both the plan and schedule. Check the revision and draft notice, then record one construction detail that the package still needs. Keep the exported sheets with the work file that produced them.
Build and reconcile the matching bar schedule
NZ slab teaching prototype · draft outputs
English narration transcript
Find B zero three in the plan, then follow the same mark into the bar schedule. This connection is one of the most useful parts of the workflow: the schedule is generated from the listed bar geometry, rather than entered again as a separate set of quantities.
In the baseline example, B zero three contains twenty-four D sixteen straight bars. Each listed bar is five thousand nine hundred and forty millimetres long. That length comes from the supplied bar extents; it has not been inferred from the analysis moment.
We can make a simple independent check. Convert the individual length to metres: five point nine four. Multiply it by twenty-four bars. The listed length for B zero three is one hundred and forty-two point five six metres.
This arithmetic is useful because it gives us a direct connection between the drawing, a schedule row and a quantity. If the count or cut length changes, we know which calculation should change with it.
The complete baseline schedule contains one hundred and ten listed bars. Its total length and theoretical mass appear beside the schedule. Read those totals together with the scope note.
The quantities include only the listed straight bars. They exclude laps, bends, chairs, waste and other unlisted reinforcement. That makes the schedule useful for this teaching exercise, but it is not a complete steel procurement quantity or a fabrication release.
Download the bar schedule as a CSV and inspect B zero three in the exported file. Check its mark, diameter, count and cut length against the drawing. Keep both outputs under the same revision record.
An AI assistant could help prepare a reconciliation report and highlight differences between versions. Its report would still need to be checked against the generated geometry and the actual export.
For your task, reproduce the listed length for B zero three. Identify four exclusions from the quantity total, then explain what additional information you would need before ordering reinforcement.
Make one change; update drawings and schedules together
NZ slab teaching prototype · draft outputs
English narration transcript
A reinforcement revision should carry through the drawing and the bar schedule together. We will make one change and check that connection all the way to the exported outputs.
Keep the baseline package first. In this example, B zero three is top reinforcement in the X direction, using D sixteen bars at a maximum spacing of two hundred millimetres. The schedule lists twenty-four bars for this mark.
Change the spacing to one hundred and fifty millimetres, then choose Regenerate plan and schedule. This is a deliberate teaching change. It is not a recommendation to increase reinforcement or an optimisation result.
Watch the top plan. More bars appear within the same entered distribution zone. Now follow B zero three into the schedule: its count increases from twenty-four to thirty-one.
The diameter and entered bar length stay the same. Each listed B zero three bar is still five thousand nine hundred and forty millimetres long. The seven additional bars therefore add forty-one point five eight metres of listed length.
The complete schedule changes from one hundred and ten to one hundred and seventeen bars. Its listed length changes from five hundred and sixty point four zero metres to six hundred and one point nine eight metres. The theoretical mass updates with it.
Check the unaffected marks too. B zero one, B zero two and B zero four retain their arrangements. This helps establish that the revision has changed the intended record without introducing unrelated changes.
Now regenerate the drawing sheets, schedule and DXF. Inspect those files, not just the updated screen. Retain the superseded package and identify the actual revision produced by the workspace. Renew any confirmation that the edit has cleared.
An AI assistant could draft a change summary for the engineer to verify. Here, the coordinated updates themselves come from the prototype’s programmed drawing and calculation tools. We have not measured a time-saving percentage.
For your task, repeat the spacing change. Reconcile the seven additional bars and their listed length, then confirm that the drawing and exported schedule describe the same revised arrangement.
Freeze the package and complete a scoped review exercise
NZ slab teaching prototype · draft outputs
English narration transcript
The drawings and schedule now agree on the revised reinforcement. The next question is what another engineer needs to review that exact package and leave a traceable outcome.
Begin with a focused request. In this teaching exercise, we ask the reviewer to examine the B zero three revision, reconcile the drawing and schedule, and identify unresolved detailing matters. Record the intended scope, deliverables and any agreed commercial arrangements before a real exchange.
Freeze the package. The prototype retains its inputs, calculated outputs, open checks and review context under a package identifier. That identifier helps detect content changes. It does not authenticate the author or establish that the engineering is correct.
Open the frozen package in the Reviewer desk. Its results are recalculated, and the reviewer can inspect the drawing evidence, source assumptions and outstanding verification categories. The identity fields in this prototype are self-declared. Our reviewer role is a clearly labelled training exercise, with no actual appointment or certification.
Here is a useful blocking comment: provide the revised B zero three drawing and matching schedule, identify the exact revision, and confirm the thirty-one bars and their entered lengths. Keep the unresolved anchorage and lap checks visible.
Return that comment as changes or evidence requested. In the file-based workflow, the reviewer exports a structured response, and the member imports it into the response history.
The member can then explain the action taken and reference the revised evidence. If the package changes, freeze a new revision so that the reviewer can examine the updated record. A member’s response alone does not close the reviewer’s finding.
The reviewer checks the evidence, records a resolution and closes the comment against the exact package examined. Wider verification items need checked evidence or explicit exclusions from the agreed scope. Scoped completion requires the relevant checks and blocking comments to permit it; the outcome does not become a design certificate.
AI could help organise comments and draft responses. The reviewer remains responsible for the judgement and recorded findings.
For your task, complete one blocking-comment exchange using the teaching files. Retain the reviewed revision, the member response and the checked closure evidence together. The final record should make clear what was examined, what changed and what remains open.