The analysis table contains actions. The drawing needs actual bar locations. How do we connect the two without losing the engineering decisions between them? In our teaching slab, four reinforcement groups connect to four bar marks. B zero one represents bottom reinforcement in X. B zero two represents bottom reinforcement in Y. B zero three represents top reinforcement in X, and B zero four represents top reinforcement in Y. The group carries the source action and selected arrangement. The linked bar set supplies the information needed to place and count the bars. The resulting mark appears in both the plan and the schedule. Switch between the top and bottom plans. Check the face and direction before comparing rows. Similar-looking reinforcement can represent a different part of the slab, so the labels matter. Our slab measures six thousand by four thousand five hundred millimetres in plan. The distribution rectangles and bar ends have been entered explicitly. The prototype uses those extents to generate the straight-bar geometry. That distinction matters near a support. A support-zone action does not, by itself, determine how far a bar should extend or how it develops its force. Anchorage, laps and other detailing decisions need the appropriate engineering assessment. This prototype does not generate those details from the moment values. The section schematic helps explain the position of the reinforcement layers and the depth used in the section calculation. It remains a schematic, rather than a complete construction section. Follow B zero three on the plan and in the schedule. Its diameter, spacing and entered extents come from linked records, so the two outputs can stay coordinated when an arrangement changes. An AI assistant could help prepare a list of missing extent references or inconsistent labels. The current bar generation is performed by the prototype’s programmed tools. For your task, identify the source group, face, direction and extent reference behind B zero three. Name one additional detailing decision that must be resolved before the arrangement could become part of construction information.