A drawing can look coordinated before the engineering behind it has been checked. To understand what our generated reinforcement means, we need to inspect the basis that connects the imported actions to the bar arrangement. Our teaching slab is two hundred millimetres thick. The entered cover is thirty millimetres, with concrete strength of thirty megapascals and reinforcement yield strength of five hundred megapascals. These are example inputs. They are not recommendations for another project. The responsible engineer confirms the applicable New Zealand design documents, governing editions, modifications and project requirements. A prefilled confirmation in a teaching file is not evidence that a real project basis has been reviewed. Open the calculation register and follow group G three. Its mapped action leads to a calculated reinforcement requirement within the prototype’s supported scope. The selected bar diameter and spacing then establish the provided reinforcement for comparison. This connection makes a useful review trail. Another engineer can examine the action, the assumptions, the calculated requirement and the arrangement that appears in the drawing. If the source or assumptions change, that trail needs to be checked again. Now look at the wider verification record. In the baseline example, the supported calculated checks show no failures, while six wider verification categories remain open. Those statements describe different parts of the evidence. A calculation result does not settle every detailing, durability or project requirement. Column punching is not assessed in this teaching example, and the restricted serviceability checks do not amount to a complete project deflection assessment. AI could help organise this record into checked items, unresolved questions and missing evidence. The engineer still decides whether the evidence is applicable and sufficient. For your task, identify one supported calculated check, one open verification item and one item not assessed. Explain why a package with no calculated failures can still need substantial engineering review. Keep those open matters visible beside the drawings.