A reinforcement revision should carry through the drawing and the bar schedule together. We will make one change and check that connection all the way to the exported outputs. Keep the baseline package first. In this example, B zero three is top reinforcement in the X direction, using D sixteen bars at a maximum spacing of two hundred millimetres. The schedule lists twenty-four bars for this mark. Change the spacing to one hundred and fifty millimetres, then choose Regenerate plan and schedule. This is a deliberate teaching change. It is not a recommendation to increase reinforcement or an optimisation result. Watch the top plan. More bars appear within the same entered distribution zone. Now follow B zero three into the schedule: its count increases from twenty-four to thirty-one. The diameter and entered bar length stay the same. Each listed B zero three bar is still five thousand nine hundred and forty millimetres long. The seven additional bars therefore add forty-one point five eight metres of listed length. The complete schedule changes from one hundred and ten to one hundred and seventeen bars. Its listed length changes from five hundred and sixty point four zero metres to six hundred and one point nine eight metres. The theoretical mass updates with it. Check the unaffected marks too. B zero one, B zero two and B zero four retain their arrangements. This helps establish that the revision has changed the intended record without introducing unrelated changes. Now regenerate the drawing sheets, schedule and DXF. Inspect those files, not just the updated screen. Retain the superseded package and identify the actual revision produced by the workspace. Renew any confirmation that the edit has cleared. An AI assistant could draft a change summary for the engineer to verify. Here, the coordinated updates themselves come from the prototype’s programmed drawing and calculation tools. We have not measured a time-saving percentage. For your task, repeat the spacing change. Reconcile the seven additional bars and their listed length, then confirm that the drawing and exported schedule describe the same revised arrangement.