The drawings and schedule now agree on the revised reinforcement. The next question is what another engineer needs to review that exact package and leave a traceable outcome. Begin with a focused request. In this teaching exercise, we ask the reviewer to examine the B zero three revision, reconcile the drawing and schedule, and identify unresolved detailing matters. Record the intended scope, deliverables and any agreed commercial arrangements before a real exchange. Freeze the package. The prototype retains its inputs, calculated outputs, open checks and review context under a package identifier. That identifier helps detect content changes. It does not authenticate the author or establish that the engineering is correct. Open the frozen package in the Reviewer desk. Its results are recalculated, and the reviewer can inspect the drawing evidence, source assumptions and outstanding verification categories. The identity fields in this prototype are self-declared. Our reviewer role is a clearly labelled training exercise, with no actual appointment or certification. Here is a useful blocking comment: provide the revised B zero three drawing and matching schedule, identify the exact revision, and confirm the thirty-one bars and their entered lengths. Keep the unresolved anchorage and lap checks visible. Return that comment as changes or evidence requested. In the file-based workflow, the reviewer exports a structured response, and the member imports it into the response history. The member can then explain the action taken and reference the revised evidence. If the package changes, freeze a new revision so that the reviewer can examine the updated record. A member’s response alone does not close the reviewer’s finding. The reviewer checks the evidence, records a resolution and closes the comment against the exact package examined. Wider verification items need checked evidence or explicit exclusions from the agreed scope. Scoped completion requires the relevant checks and blocking comments to permit it; the outcome does not become a design certificate. AI could help organise comments and draft responses. The reviewer remains responsible for the judgement and recorded findings. For your task, complete one blocking-comment exchange using the teaching files. Retain the reviewed revision, the member response and the checked closure evidence together. The final record should make clear what was examined, what changed and what remains open.