A coloured flood plot can attract attention, but the analysis needs more evidence than the picture. We need to know which model ran, whether it completed and whether its behaviour is credible for the intended use. For Site A at Mission Bay, retain the native project revision, software version, input files and execution record. Preserve the original evidence model while making controlled copies for sensitivity tests. The earlier Site A handover records preparation and unsuccessful or unverified execution stages. Those records are useful lessons in model control. They must not be presented as completed flood results. We will add numerical demonstrations only after successful native runs and their outputs are checked. During a verified run, inspect the computational settings and the way the mesh represents important flow features. Review the time step, boundaries, solver warnings and available water-balance information. A run that reaches its end time may still need substantial examination. Look at the behaviour through time. Does water enter and leave through the intended routes? Are unusual peaks, oscillations or persistent ponding explained by the model and its assumptions? Consider sensitivity to the mesh, time step and other important settings. An AI agent could help prepare repeatable run instructions and organise the returned logs. A statement that it has run the software must be supported by the actual operation record and resulting files. For your task, prepare a run acceptance checklist for Site A. Include the revision, completion status, warnings, water balance and one sensitivity check. Mark every item that still needs an actual native run.